Ragged Lake Transit Centre Expansion & Fleet Electrification Project
- Client
- Halifax Regional Municipality | Halifax Transit
- Location
- Halifax, Nova Scotia
- Project Type
- Industrial
- Services Performed
Avondale served as General Contractor for the RLTC Expansion & Fleet Electrification project, adding approximately 50,000 square feet of storage for 60 standard bus equivalents and the infrastructure needed to support battery-electric buses. Working within an active transit facility, Avondale carefully phased construction and coordinated site logistics to maintain safe access and keep Halifax Transit services running. The expansion increased indoor storage capacity and supported Halifax’s transition to electric buses.
Project Highlights
- Project Size
- 50,000 sq ft
- Designer
- AECOM Canada & EastPoint Engineering
First of It's Kind
As a first-of-its-kind facility in Canada, the project highlighted the importance of forward-thinking design and construction in preparing essential municipal infrastructure for evolving transportation technologies.